Back To Top Skip to main content
Welcome to Something Different
  • For same day dispatch
    order within the next
  • No Minimum Order Icon
  • Delivery
Back to Article List

New Warehouse: Time Lapse Video

Published date: 10/09/2021 15:31

ThumbnailWarehouse.png

We recently moved into our new warehouse after several weeks of fast-paced renovations. This time lapse video looks back at the renovation work, showing the expansion of Blocks F and G, creating a large warehouse space. Stay tuned for more time lapse footage coming soon.

 

Block F has been converted into our main stock location as walls, offices and pipelines have been removed by demolition contractors. The next time lapse will show the stock move last week and the busy week of picking and packing happening this week.

Block F New Warehouse

New access routes were installed last month to ensure the space is fully compliant with safety regulations. New wiring and lighting is now in place to light the stock in Block F. The video also shows the secondary block in the new warehouse, Block G, which has been expanded into a large open-plan space as the large wall in the centre has been removed. The ceiling of block G has been sealed with a specialist protective coating to safely prepare the space.

Block G Treatment

Block G New Warehouse

 

Comments

There are currently no comments, be the first to comment.

Leave us your comment

You need to Login to add a comment.